BALLAST WATER MANAGEMENT SYSTEM


Installation of complied BWTS with required modifications in Main switchboard and Installation of Power distribution panel for BWTS requirements.

Major Projects

VESSELS

IMG_6697
IMG_6695
IMG_6494

DIVINE DOLPHIN


  • Installed New Panels for FiFi Control System.
  • Changed Conrol Panels for Winches
  • Added Electrical Panel for additional requirement
  • All other Electrical Systems Repaired & Tested.
  • New Telephone and Camera System supplied.
  • Fire Alarm System & Navigation Light System Repairs.
  • All Lighting System- Supply and Installation.


VALIANT 1


  • Freezer Controls Repair
  • Changed Conrol Panels for Winches
  • Intercom Repairs
  • All other Electrical Systems Repaired & Tested.
  • Repairs Telephone and Camera System supplied.
  • Addressable Fire Alarm System Repair
  • Outboard Engine Repairs


20210315_083338
20210315_082416
20210321_085728
20210320_140545
20210317_123811
20210314_103654

DREDGERS

DREDGER AMBIORIX


Jobs done in the Electrical Panels as per requirement from Client.

IMG_1612
IMG_1617
IMG_6538
20201006_123913
20201006_130028
20201006_123902
20201006_100643

 DREDGER KALIS 2


  • Revamped Complete Electrical System after a Long lay Off.
  • Trouble-Shooting Repairs in the Dredger Controls system.
  • Crane Repairs.
  • All other Electrical Systems Repaired & Tested.
  • Work done on Engine and Generator Controls.


LIFTBOATS

amberjack1
amberjack2
amberjack leg works

  AMBERJACK


  • Setting up the Liftboat for all Projects in the middle east.
  • Oldest Operating Liftboat in Middle East.
  • Complete Bridge Physical appearance changed.
  • Modifications done in the Synchronisation Panel.
  • AC and Chiller Repairs done.
  • Crane Controls repairs done.


  JANA 501


  • All electrical and Electroic Circuits tested for full funtionality to go in Project.
  • Repairs done in Crane Controls.
  • Added Items as per ARAMCO Punch list.
  • Software problems Highlighted as no backup or Passwords supplied along with new Vsl.
  • Attended Vsl for its first Project at KSA and ensured all functionality to customer satisfaction.


IMG_20190903_164152
IMG_20190806_154703
IMG_20190619_094614
s1-5f187e3b5b06c

  ZAMIL LB3


  • All electrical and Electroic Circuits tested for full funtionality to go in Project.
  • Faults in Completion on Commisioning Items rectified
  • Settings verified to be in ARAMCO requiremnt limits.
  • Repairs in UPS.
  • Complete Checks on the Jacking system done.


DIXIE PATRIOT


  • Changed Complete Electrical Panel to all on Another Generator.
  • Added Safety Systems as per ARAMCO Requirement.
  • Installtion of Helideck C& H Systems.
  • Setting up the Vsl for Projects as per Client requirement.
  • Auto Pilot Repairs.
  • Repairs in Fire Alarm System.
  • All other Electrical Systems Repaired & Tested.
  • New Telephone System supplied.
  • All Lighting System- Supply and Installation.
  • Emergency Lighting system add ons.


dixie
dixie3
dixie4
dixie2
dixie1
IMG_2972

  KINGFISH


  • Setting up the Liftboat for all Projects.
  • Major repairs done in the Electro Hydraulic System of Jacking system.
  • Repairs done in Electrical Power generation systems.
  • Repairs in Galley Fire Suppression System.
  • Jobs done in Fire and Gas Detection systems.


  WHALE SHARK


  • Setting up the Liftboat for all Projects in the middle east
  • Repairs in Generator Controls.
  • Add on Power Supply for Extra Hydraulic machinery.
  • Repairs done in the Jacking system.
  • Replacing main transformer.
  • Setting up Vsl to operate during idle with complete external Power. 
  • AC and Chiller Repairs done.
  • Crane Controls repairs done.


kingfish
kingfish1
whaleshark
IMG_3549
IMG_3548
IMG_3551
IMG_3550
WhatsApp Image 2022-02-11 at 13.34.47 (2)
PHOTO1
PHOTO2

 DYNACOM KITSOS   @BAHRAIN


  • Modification of TERASAKI systems
  • Modified MCCB's and assosicated circuits in TERASAKI Main switchboards
  • Upgradation of starter panels by Replacing MCCB's 
  • Upgradation of TERASAKI Alarm monitoring system
  • Breaker tesing and servicing


YACHT DXB

Control-Systems_edit-690x430
a7ef579dc27ad5ca_800x800ar

VFD BASED

WINDLASS CONTROLS

NAIAD DYNAMICS

FIN STABILIZERS

gettyimages-200193468-002-1024x1024
IMG-20220219-WA0020
20220216_165102